The East Link project
Involvement: 2022-2023
Sector: High-speed railway
Project phase: Schematic and detail design
Location: Järna – Linköping, Sweden
Owner: Trafikverket (Swedish transport administration)
Role: BIM coordinator
Involvement: 2022-2023
Sector: High-speed railway
Project phase: Schematic and detail design
Location: Järna – Linköping, Sweden
Owner: Trafikverket (Swedish transport administration)
Role: BIM coordinator